Sign inBook a demo

Developers and housebuilders

For developers.

Land first: constraints, planning and net gain. Then the buildings, with their records.

20 February 2014Latest capture
Then and nowDrag to compare

Imagery: Esri, Maxar, Earthstar Geographics, and the GIS User Community. Real imagery; the site and scheme are illustrative.

A regional housebuilder with six live sites

  • 6live sites
  • 410homes in the pipeline
  • 38planning conditions open
  • 30 yearsof net gain to monitor

What the law asks.

General information as at October 2026. Not legal advice; check the regulation or ask a competent person.

  1. DutyIn plain wordsWhere in SAMRISK
  2. Discharge the conditionsPre-commencement conditions approved before work starts.Planning
  3. Net gainAt least 10% biodiversity gain, managed and monitored for 30 years.Biodiversity net gain
  4. Flood and drainageFlood risk known; drainage designed, approved and kept up.Site risks, drainage
  5. Protected treesConsent or notice before works to protected trees.Tree preservation orders
  6. Dig safelyServices located and a permit before anyone breaks ground.Buried services
  7. Run the siteContractors controlled under the construction regulations.Contractors and permits
  8. Hand overHigher-risk buildings through the gateways, with the golden thread.Safety case

The combination.

15 tools for a regional housebuilder with six live sites: 2 buildings, 6 sites, 20 people. The cheapest plan that fits is Pro.

Buildings

  • Contractors and permits£15Add-on
  • Material call-offsCall-offs for the build£15In Pro
  • Audits£0Free

Land

  • Sites£0Free
  • ProposalsEvery constraint in one summary£15In Pro
  • Site risks£15Add-on
  • Site settingHeights, light and designations£15Add-on
  • Boundaries and title£15Add-on
  • Buried services£15Add-on
  • Planning38 conditions on the clock£15Add-on
  • Biodiversity net gainThe 30-year plan£25Add-on
  • Drainage and SuDSYear 1 and year 5 evidence£10Add-on

Connected by

  • Tasks£0Free
  • Documents£0Free
  • Calendar£0Free

DevelopersPro

  • Pro plan5 buildings, 5 sites, 15 people£49
  • 1 extra site£12 a month each£12
  • 5 extra people£5 a month each£25
  • Site risks£15
  • Site setting£15
  • Boundaries and title£15
  • Buried services£15
  • Planning£15
  • Biodiversity net gain£25
  • Drainage and SuDS£10
  • Contractors and permits£15
  • Land pack25% off 7 land tools−£28

In the plan Proposals, Material call-offs

Free on every plan Sites, Tasks, Documents, Calendar, Audits

A month£183

Prices as set in October 2026. See pricing for the current figures.

Try other sets in the kit picker

How it connects

From a field to a handover.

Meadow Farm phase 2: 32 homes on 1.9 ha, an illustrative scheme. The land records carry through to the buildings.

Connected todayProposed: needs the shared action register1 of 4 links live

  1. Site risks

    SRS-0021

    Site risk search: flood zone 2 on the east edge

    Meadow Farm, phase 2

  2. Proposed

    Proposals

    PRP-0007

    The proposal lists every constraint

    Constraints summary

  3. Proposed

    Planning

    PLN-0114

    Condition 14: drainage before commencement

    Discharge by 4 Dec

  4. Proposed

    Biodiversity net gain

    BNG-0003

    The net gain plan: 11.4% over 30 years

    6 habitat parcels

  5. Building tools

    BLD-MDF08

    Terrace A handed over with its records

    Meadow Farm, terrace A

A week in their life.

  1. Mon19 Oct

    08:00

    Owen Price

    Runs a site risk search on a new option near Abingdon.

    SRS-0024
  2. Tue20 Oct

    11:15

    Owen Price

    Proposal summary for the land committee.

    PRP-0008
  3. Wed21 Oct

    09:40

    Groundline Civils

    Permit to dig approved after the cable search.

    PTD-0098
  4. Thu22 Oct

    13:00

    Hannah Cole

    Condition 14 discharged; condition 9 is next.

    PLN-0114
  5. Fri23 Oct

    10:00

    Hannah Cole

    Habitat parcel 3 planted; year 1 monitoring booked.

    BNG-0003

Real screens

See it in the app.

01 / 04
app.samrisk.co.uk/dashboard
What needs you todayOne page for the morning: what is overdue, what is due this week and what changed. Illustrative records.
The building overviewA higher-risk building at a glance: the figures that matter, the journey with the regulator and what is next. Illustrative records.
The compliance matrixEvery statutory check for every place on one matrix, with what is booked and what is overdue. Illustrative records.
Every action, one registerEvery action across every building and site, with where it came from and its latest update. Illustrative records.

The example estate; records are illustrative.

See your site from the ground up.