Swales, ponds, soakaways, attenuation tanks, green roofs, permeable paving, rain gardens, bioretention, wetlands, detention basins, filter strips and rainwater harvesting, each plotted on the site map with capacity, outfall, condition and installer.
Record the SAB (SuDS approving body) reference, approval date and supporting drawings. Year 1 and year 5 inspection dates are filled in from the installation date when you add a feature, and you can change them.
Each feature has its own last and next inspection dates and its current condition. Next inspection, year 1 and year 5 dates appear on the site and portfolio calendars.
Real screens
How drainage and suds looks in SAMRISK, on the example estate.
The example estate; records are illustrative.
Feeds it
It feeds
SuDS approving bodies under Schedule 3 of the Flood and Water Management Act 2010 have operated in Wales since January 2019. In England, check whether Schedule 3 applies to your development. The register works the same wherever the site is.
Adoption arrangements vary by area. Record the adoption status in the maintenance notes and attach the agreement.